Field Notes
Sketch the test area before shipping the robot.
A proposed pilot starts with a sketch. Our Robopark area planner turns the space a robot needs into something a manufacturer and a test operator can discuss.
Put the task on the map
Define the dimensions and mark where the robot should work, charge or stop. Include access for a person who needs to intervene. The sketch records the desired arrangement for discussion.
Agree before dispatch
Share the sketch with the product brief. Both sides can then check the operating limits, site suitability, supervision and return arrangements before any equipment travels.